Power plant · Test Valley, England, United Kingdom

South Way, Walworth Business Park - Solar Photovoltaics

South Way, Walworth Business Park - Solar Photovoltaics is a cancelled power plant in Test Valley, England, United Kingdom, with 5.2 MW of capacity, operated by Saber Renewable Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTest Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address54 South Way Walworth Business Park, SP10 5AFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Feb 2025 (reference 25/00252/REJN, planning authority Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Apr 2025 (withdrawn, reference 25/00252/REJN, planning authority Test Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSaber Renewable Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2155, -1.4490DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

South Way, Walworth Business Park - Solar Photovoltaics is the 1,737th-largest of 3,430 power plants in England and the 2,714th-largest of 5,050 in the United Kingdom by capacity; its 5.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,737th of 3,43071,985 MW<0.1%
United Kingdom2,714th of 5,050115,642 MW<0.1%
All power plants in our data8,313th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 255 grid connections (144 operating, 1,537 MW), 227 substations, 26 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Andover East PrimarySubstation——0.6 km
Lower Wyke Farm - PV grid connectionGrid connection20 MWPlanned2.0 km
Solar 30.4 MW grid connection at Wherwell PV GENGrid connection30.4 MWOperating2.3 km
Andover Town PrimarySubstation——2.7 km
Andover BSPSubstation——3.2 km
OWLS Lodge Solar Park grid connectionGrid connection9.5 MWOperating4.3 km
Venture WestData center——21 km
Sky ChilworthData center——28 km
Regit4uData center——37 km