Power plant · West Suffolk, England, United Kingdom
Skyliner Way - Solar Array
Skyliner Way - Solar Array is a permitted power plant in West Suffolk, England, United Kingdom, with 1 MW of capacity, operated by 3TI Energy Hubs Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | West Suffolk (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Unit 1, Skyliner Way, Bury St Edmunds, IP32 7FR | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 6 Mar 2024 (permit DC/24/0099/P14JPA, Town and Country Planning Act, issued by West Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 22 Jan 2024 (reference DC/24/0099/P14JPA, planning authority West Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Mar 2024 (granted, reference DC/24/0099/P14JPA, planning authority West Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | 3TI Energy Hubs Ltd (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.2405, 0.7605 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority West Suffolk, reference DC/24/0099/P14JPA)
- Permit applied for (planning authority West Suffolk, reference DC/24/0099/P14JPA)
How it compares
Skyliner Way - Solar Array is the 1,581st-largest of 1,651 power plants planned, permitted or under construction in England and the 2,458th-largest of 2,549 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,581st of 1,651 | 172,174 MW | <0.1% |
| United Kingdom | 2,458th of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,691st of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 3 data centers and 1 transmission line, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| US Air Force data center, Brandon | Data center | — | — | 23 km |
| Bramford to Twinstead | Transmission line | — | Permitted | 27 km |
| Redcentric Cambridge | Data center | — | — | 42 km |
| West Cambridge Data Centre | Data center | — | — | 47 km |
Operator and place
More from 3TI Energy Hubs Ltd
- Bentley Motors Limited, Pyms Lane - Solar Panels1.12 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
- Navitus Bay Wind Park970 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.