Power plant · Cheshire East, England, United Kingdom
Bentley Motors Limited, Pyms Lane - Solar Panels
Bentley Motors Limited, Pyms Lane - Solar Panels is a permitted power plant in Cheshire East, England, United Kingdom, with 1.12 MW of capacity, operated by 3TI Energy Hubs Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cheshire East (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Bentley Motors Limited Pyms Lane, CW1 3PL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 16 May 2025 (permit 25/1190/PRIOR-14J, Town and Country Planning Act, issued by Cheshire East) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Apr 2025 (reference 25/1190/PRIOR-14J, planning authority Cheshire East) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 16 May 2025 (granted, reference 25/1190/PRIOR-14J, planning authority Cheshire East) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | 3TI Energy Hubs Ltd (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.12 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1067, -2.4694 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Cheshire East, reference 25/1190/PRIOR-14J)
- Permit applied for (planning authority Cheshire East, reference 25/1190/PRIOR-14J)
How it compares
Bentley Motors Limited, Pyms Lane - Solar Panels is the 1,558th-largest of 1,651 power plants planned, permitted or under construction in England and the 2,429th-largest of 2,549 in the United Kingdom by capacity; its 1.12 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,558th of 1,651 | 172,174 MW | <0.1% |
| United Kingdom | 2,429th of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,661st of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 171 substations, 157 grid connections (95 operating, 735 MW), 18 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 4.5 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 13 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 14 km |
| Internet Central data center, England | Data center | — | — | 18 km |
| Chelford | Substation | — | — | 22 km |
| Alderley House grid connection | Grid connection | 1.8 MW | Operating | 25 km |
| Alderley Park CHP grid connection | Grid connection | 2.6 MW | Operating | 25 km |
| Woodhouse Nurseries grid connection | Grid connection | 3.4 MW | Operating | 26 km |
| S.W. Macclesfield | Substation | — | — | 28 km |
Operator and place
More from 3TI Energy Hubs Ltd
- Skyliner Way - Solar Array1 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
- Navitus Bay Wind Park970 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.