Power plant · Bristol, City of, England, United Kingdom

Severn Road Solar Park

Severn Road Solar Park is a power plant in Bristol, City of, England, United Kingdom, with 1.8 MW of capacity, operated by Bristol City Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBristol, City of (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSevern Road, Avonmouth, BS11 0YLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 May 2015 (permit 14/05915/FB, Town and Country Planning Act, issued by Bristol, City of)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Dec 2014 (reference 14/05915/FB, planning authority Bristol, City of)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 May 2015 (granted, reference 14/05915/FB, planning authority Bristol, City of)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBristol City CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area3.25 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5329, -2.6663DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Severn Road Solar Park is the 2,958th-largest of 3,430 power plants in England and the 4,399th-largest of 5,050 in the United Kingdom by capacity; its 1.8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,958th of 3,43071,985 MW<0.1%
United Kingdom4,399th of 5,050115,642 MW<0.1%
All power plants in our data10,752nd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 14/05915/FB
  2. Started operating

Nearby

Within 50 km of this power plant: 377 grid connections (44 operating, 609 MW), 29 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Bristol - Severn Road Chittening grid connectionGrid connection——0.5 km
Bristol Severn Road Solar Park, Avonmouth grid connectionGrid connection——0.6 km
Bristol Avonmouth Wind Farm Severn Road grid connectionGrid connection——0.6 km
nLighten BristolData center——5.9 km
Hinkley Point C ConnectionTransmission line—Permitted23 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned25 km
Vantage Data Centers - CWL13Data center——25 km
Insight Data LtdData center——26 km
Alderton PrimarySubstation——31 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page