Power plant · Somerset, England, United Kingdom
Saltlands Avenue - Solar Parks
Saltlands Avenue - Solar Parks is a planned solar power plant in Somerset, England, United Kingdom, with 8.89 MW of capacity, operated by Somerset County Council.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Somerset (planning authority), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Saltlands Avenue, Bridgwater, TA6 3JS | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Jan 2022 (reference 20/22/00001, planning authority Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Somerset County Council (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 8.89 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 12.1 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.1433, -2.9923 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Somerset, reference 20/22/00001)
How it compares
Saltlands Avenue - Solar Parks is the 1,213th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,949th-largest of 2,548 in the United Kingdom by capacity; its 8.89 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,213th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 1,949th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,066th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 39 grid connections (26 operating, 171 MW), 20 substations, 6 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tata Communications Highbridge Datacentre | Data center | — | — | 9.6 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 24 km |
| Insight Data Ltd | Data center | — | — | 25 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 26 km |
| Fleet Air Arm Museum grid connection | Grid connection | 4.01 MW | Operating | 28 km |
| Southfield Farm Solar Park grid connection | Grid connection | 7.6 MW | Operating | 30 km |
| Larkhill Primary | Substation | — | — | 32 km |
| Chiltern Cantello grid connection | Grid connection | 4.75 MW | Operating | 32 km |
| Chilton Cantello Primary | Substation | — | — | 32 km |
Operator and place
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.