Power plant · County Durham, England, United Kingdom

Salters Lane - Solar Panels

Salters Lane - Solar Panels is a planned battery storage plant in County Durham, England, United Kingdom, with 18 MW of capacity, operated by Grupotec Solar Uk 9 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSouth Sharpley Farm, Salters Lane, Seaham, SR7 0NJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jul 2025 (reference DM/25/01801/FPA, planning authority Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGrupotec Solar Uk 9 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity18 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.8344, -1.4117DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Durham, reference DM/25/01801/FPA)

How it compares

Salters Lane - Solar Panels is the 1,048th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,699th-largest of 2,548 in the United Kingdom by capacity; its 18 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,048th of 1,650171,264 MW<0.1%
United Kingdom1,699th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data3,841st of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 285 grid connections (146 operating, 1,810 MW), 164 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wind 6 MW grid connection at Hawthorn PitGrid connection6 MWOperating0.7 km
Wind 7.79 MW grid connection at Stoney CutGrid connection7.79 MWOperating1.1 km
Battery storage and Solar 118.5 MW grid connection at Salters Lane PVGrid connection119 MWPlanned2.0 km
Hawthorn Pit GridSubstation——3.2 km
Hawthorn PitSubstation——3.3 km
Stoney CutSubstation——4.0 km
Stellium Newcastle CampusData center——21 km
DXC Wynyard Data CenterData center——23 km
Lumen Technologies data center, MiddlesbroughData center——31 km

Operator and place

More from Grupotec Solar Uk 9 Limited

Other power plants in England

All 5872 power plants in England, United Kingdom