Salcey Green Farm - Solar Panels is a cancelled solar power plant in Milton Keynes, England, United Kingdom, with 5 MW of capacity, operated by Salcey Green Farm.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMilton Keynes (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSalcey Green Farm, Forest Road, Hanslope, MK19 7DEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Apr 2024 (reference 24/00830/FUL, planning authority Milton Keynes)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Jul 2024 (refused, reference 24/00830/FUL, planning authority Milton Keynes)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSalcey Green Farm (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area6.74 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1404, -0.8271DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Milton Keynes, reference 24/00830/FUL)
  2. Permit applied for (planning authority Milton Keynes, reference 24/00830/FUL)

How it compares

Salcey Green Farm - Solar Panels is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,910th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 31 grid connections (14 operating, 115 MW), 16 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 460010263)Data center——11 km
Pulsant Milton Keynes SE-1Data center——11 km
nLighten Milton KeynesData center——11 km
East Claydon GSPSubstation——24 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating28 km
Cottisford PrimarySubstation——28 km
Pembridge Farm grid connectionGrid connection131 MWPlanned29 km
Launton - Battery grid connectionGrid connection40 MWPlanned31 km
Bicester North BSPSubstation——33 km