Power plant · Bath and North East Somerset, England, United Kingdom
Resourceful Earth Limited - Anaerobic Digester Facility
Resourceful Earth Limited - Anaerobic Digester Facility is a cancelled power plant in Bath and North East Somerset, England, United Kingdom, with 2.2 MW of capacity, operated by Resourceful Earth Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bath and North East Somerset (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Resourceful Earth Limited Charlton Field Lane, Queen Charlton Bristol, BS31 2TN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Feb 2021 (reference 21/00419/EFUL, planning authority Bath and North East Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 10 Mar 2022 (refused, reference 21/00419/EFUL, planning authority Bath and North East Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Resourceful Earth Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3913, -2.5246 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Resourceful Earth Limited - Anaerobic Digester Facility is the 2,755th-largest of 3,430 power plants in England and the 4,109th-largest of 5,050 in the United Kingdom by capacity; its 2.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,755th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,109th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 10,277th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 121 grid connections (78 operating, 800 MW), 49 substations, 9 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 12 km |
| Homewood Farm grid connection | Grid connection | 1 MW | Planned | 16 km |
| nLighten Bristol | Data center | — | — | 17 km |
| Bradford-On-Avon Primary | Substation | — | — | 18 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 18 km |
| 25MW PV Trowbridge Solar grid connection | Grid connection | 26.6 MW | Planned | 21 km |
| Spring Quarry West Primary | Substation | — | — | 21 km |
| Ganbrook grid connection | Grid connection | 45 MW | Planned | 21 km |
| Data center, England (OSM way 996865179) | Data center | — | — | 21 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.