Power plant · Dacorum, England, United Kingdom
Pudds Cross Farm, Pudds Cross - Solar Panels & Battery Energy Storage
Pudds Cross Farm, Pudds Cross - Solar Panels & Battery Energy Storage is a permitted power plant in Dacorum, England, United Kingdom, with 10 MW of capacity, operated by BSR Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Dacorum (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Pudds Cross Farm Pudds Cross Bovingdon, HP3 0NQ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 23 Dec 2025 (permit 25/01535/MFA, Town and Country Planning Act, issued by Dacorum) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Jun 2025 (reference 25/01535/MFA, planning authority Dacorum) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 23 Dec 2025 (granted, reference 25/01535/MFA, planning authority Dacorum) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | BSR Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.7109, -0.5428 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Dacorum, reference 25/01535/MFA)
- Permit applied for (planning authority Dacorum, reference 25/01535/MFA)
How it compares
Pudds Cross Farm, Pudds Cross - Solar Panels & Battery Energy Storage is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,441st of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 2,237th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,307th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 165 substations, 149 data centers (1 operating, 88 MW), 101 grid connections (47 operating, 469 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Cokes Lane Primary | Substation | — | — | 5.1 km |
| Generation 99 MW grid connection at Amersham Main | Grid connection | 99 MW | Planned | 9.0 km |
| NTT Hemel Hempstead 2 | Data center | — | — | 9.1 km |
| NTT Hemel Hempstead 3 | Data center | — | — | 9.3 km |
| Amersham GSP | Substation | — | — | 9.3 km |
| NTT Hemel Hempstead 4 | Data center | — | — | 9.4 km |
| Grassingham Road Primary | Substation | — | — | 11 km |
| Wapseys Wood grid connection | Grid connection | 2 MW | Operating | 14 km |
| Wapseys Wood III grid connection | Grid connection | 6.65 MW | Operating | 14 km |
Operator and place
More from BSR Energy
- Preston Farm, Preston Candover - Solar PV Array28 MW · permitted
- Pudds Cross Farm, Pudds Cross - Solar Panels & Battery Energy Storage22 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.