Power plant · West Northamptonshire, England, United Kingdom
Preston, Deanery - Solar Farm
Preston, Deanery - Solar Farm is a planned solar power plant in West Northamptonshire, England, United Kingdom, with 27.8 MW of capacity, operated by Grange Farm Partnership.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | West Northamptonshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | NE/O Preston Deanery, NN7 2DS | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 16 Oct 2023 (reference 2023/7911/MAF, planning authority West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Grange Farm Partnership (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 27.8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 31.6 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.2031, -0.8396 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority West Northamptonshire, reference 2023/7911/MAF)
How it compares
Preston, Deanery - Solar Farm is the 883rd-largest of 1,650 power plants planned, permitted or under construction in England and the 1,439th-largest of 2,548 in the United Kingdom by capacity; its 27.8 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 883rd of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 1,439th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,991st of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 21 grid connections (10 operating, 91.1 MW), 10 data centers and 9 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hellermann Tyton Data | Data center | — | — | 6.4 km |
| Pulsant Milton Keynes SE-1 | Data center | — | — | 17 km |
| Data center, England (OSM way 460010263) | Data center | — | — | 17 km |
| East Claydon GSP | Substation | — | — | 31 km |
| Shelswell Solar Park grid connection | Grid connection | 4.75 MW | Operating | 32 km |
| Cottisford Primary | Substation | — | — | 33 km |
| Pembridge Farm grid connection | Grid connection | 131 MW | Planned | 34 km |
| Launton - Battery grid connection | Grid connection | 40 MW | Planned | 36 km |
| Bicester North Primary | Substation | — | — | 38 km |
Operator and place
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.