Power plant · Wiltshire, England, United Kingdom

Potterne Park Farm, Potterne - Solar Farm

Potterne Park Farm, Potterne - Solar Farm is a permitted solar power plant in Wiltshire, England, United Kingdom, with 49.9 MW of capacity, operated by Potterne Solar Project Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressS/O Potterne Park Farm, Nr Potterne, Devizes, SN10 5QTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Apr 2026 (permit PL/2023/10332, Town and Country Planning Act, issued by Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Dec 2023 (reference PL/2023/10332, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Apr 2026 (granted, reference PL/2023/10332, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Apr 2026 (appeal granted, reference PL/2023/10332, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Jul 2025 (refused, reference PL/2023/10332, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPotterne Solar Project Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area79.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3090, -1.9840DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Wiltshire, reference PL/2023/10332)
  2. Permit granted (appeal granted, planning authority Wiltshire, reference PL/2023/10332)
  3. Permit refused (planning authority Wiltshire, reference PL/2023/10332)
  4. Permit applied for (planning authority Wiltshire, reference PL/2023/10332)

How it compares

Potterne Park Farm, Potterne - Solar Farm is the 454th-largest of 1,650 power plants planned, permitted or under construction in England and the 800th-largest of 2,548 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England454th of 1,650171,264 MW<0.1%
United Kingdom800th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,897th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 200 grid connections (124 operating, 1,331 MW), 120 substations, 8 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Potterne Park Farm grid connectionGrid connection49.9 MWPlanned1.1 km
Easterton PrimarySubstation——2.0 km
Blounts Court Farm grid connectionGrid connection15 MWPlanned2.3 km
Lower End PV grid connectionGrid connection4.28 MWOperating4.0 km
Devizes PrimarySubstation——4.5 km
Bromham PrimarySubstation——9.7 km
Data center, England (OSM way 996865179)Data center——20 km
Ark Data CentresData center——20 km
AWS Swindon Data CentreData center——28 km

Operator and place

Grid connections attached to this power plant

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page