Power plant · Cheshire West and Chester, England, United Kingdom
Portmanmoor Road Industrial Estate, Splott - Battery Storage Units
Portmanmoor Road Industrial Estate, Splott - Battery Storage Units is a permitted power plant in Cheshire West and Chester, England, United Kingdom, with 10 MW of capacity, operated by Infinis Energy Services Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cheshire West and Chester (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Adj To Electricity Substation, The A55 At Bellevue Lane, Guilden Sutton, Chester, CH3 7EZ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 22 Jul 2024 (permit 24/00935/FUL, Town and Country Planning Act, issued by Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 23 Apr 2024 (reference 24/00935/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Jul 2024 (granted, reference 24/00935/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Infinis Energy Services Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.2047, -2.8419 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Portmanmoor Road Industrial Estate, Splott - Battery Storage Units is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,441st of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,237th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,307th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 150 grid connections (84 operating, 635 MW), 127 substations, 16 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| nLighten Chester | Data center | — | — | 7.4 km |
| The Babbage Centre | Data center | — | — | 15 km |
| nLighten Edge Data Centre Liverpool | Data center | — | — | 18 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 26 km |
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 27 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 27 km |
| Bold GSP | Substation | — | — | 27 km |
| Unit 1 Junction Lane grid connection | Grid connection | 5.26 MW | Planned | 30 km |
| Parkside Railway Station grid connection | Grid connection | 3 MW | Operating | 31 km |
Operator and place
More from Infinis Energy Services Limited
- Maltby Solar Farm50 MW · planned
- Litchardon Cross Solar Farm49.9 MW
- South Pargillis - Battery Storage42 MW · permitted
- Maltby Solar Farm20 MW · planned
- Aveley Landfill, Sandy Lane - PV Solar Array & Battery Energy Storage16 MW · permitted
- Stoneclough - Battery Energy Storage7 MW · permitted
- Rigby PV+BESS grid connection4.26 MW
- Rigby Houghton Landfill grid connection4 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.