Power plant · Cheshire West and Chester, England, United Kingdom

Portmanmoor Road Industrial Estate, Splott - Battery Storage Units

Portmanmoor Road Industrial Estate, Splott - Battery Storage Units is a permitted power plant in Cheshire West and Chester, England, United Kingdom, with 10 MW of capacity, operated by Infinis Energy Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCheshire West and Chester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdj To Electricity Substation, The A55 At Bellevue Lane, Guilden Sutton, Chester, CH3 7EZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Jul 2024 (permit 24/00935/FUL, Town and Country Planning Act, issued by Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Apr 2024 (reference 24/00935/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Jul 2024 (granted, reference 24/00935/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinis Energy Services LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2047, -2.8419DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Portmanmoor Road Industrial Estate, Splott - Battery Storage Units is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,441st of 2,174186,088 MW<0.1%
United Kingdom2,237th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,307th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 150 grid connections (84 operating, 635 MW), 127 substations, 16 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten ChesterData center——7.4 km
The Babbage CentreData center——15 km
nLighten Edge Data Centre LiverpoolData center——18 km
Keuper Underground Gas Storage Facility Material Change 1Gas storage facility—Planned26 km
Salinae Hydrogen Storage projectGas storage facility—Planned27 km
Keuper Gas Storage ProjectGas storage facility—Permitted27 km
Bold GSPSubstation——27 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned30 km
Parkside Railway Station grid connectionGrid connection3 MWOperating31 km