Power plant · County Durham, England, United Kingdom

Number One Industrial Estate - Solar Panels

Number One Industrial Estate - Solar Panels is a permitted power plant in County Durham, England, United Kingdom, with 1.02 MW of capacity, operated by Gardner Aerospace.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit 24 Number One Industrial Estate Consett, DH8 6SRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date4 Apr 2022 (permit DM/22/00431/FPA, Town and Country Planning Act, issued by County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Feb 2022 (ref. DM/22/00431/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Apr 2022 (granted, ref. DM/22/00431/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGardner AerospaceDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.02 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.8652, -1.8241DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Number One Industrial Estate - Solar Panels is the 2,075th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,093rd-largest of 3,222 in the United Kingdom by capacity; its 1.02 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,075th of 2,174186,088 MW<0.1%
United Kingdom3,093rd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data6,325th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 255 grid connections (130 operating, 1,606 MW) and 154 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
ConsettSubstation——1.2 km
Biomass 1 MW grid connection at ConsettGrid connection1 MWOperating1.3 km
2.1MW Solar - Lanchester Wine Cellars Ltd grid connectionGrid connection2.1 MWOperating5.0 km
Wind 1 MW grid connection at Annfield 66/20kVGrid connection1 MWOperating5.0 km
AnnfieldSubstation——6.1 km
Annfield 66/20kVSubstation——6.1 km

Operator and place

More from Gardner Aerospace

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page