Power plant · Cheshire West and Chester, England, United Kingdom

Native River

Native River is a power plant in Cheshire West and Chester, England, United Kingdom, with 57 MW of capacity, operated by Varco Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCheshire West and Chester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdj Electricity Substation, CH66 2HDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2025DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Apr 2021 (permit 20/04767/FUL, Town and Country Planning Act, issued by Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Dec 2020 (reference 20/04767/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Apr 2021 (granted, reference 20/04767/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVarco EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity57 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2657, -2.9434DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Cheshire West and Chester, reference 20/04767/FUL)
  3. Permit applied for (planning authority Cheshire West and Chester, reference 20/04767/FUL)

How it compares

Native River is the 134th-largest of 3,430 power plants in England and the 285th-largest of 5,050 in the United Kingdom by capacity; its 57 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England134th of 3,43071,965 MW<0.1%
United Kingdom285th of 5,050115,622 MW<0.1%
All power plants in our data1,661st of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 119 grid connections (72 operating, 565 MW), 109 substations, 10 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten ChesterData center——2.5 km
nLighten Edge Data Centre LiverpoolData center——8.9 km
The Babbage CentreData center——15 km
Bold GSPSubstation——25 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned29 km
Amazon Man 8 grid connectionGrid connection1.39 MWPlanned30 km
Bickerstaffe WTW grid connectionGrid connection1.25 MWOperating30 km
Newton Le WillowsSubstation——30 km
HaydockSubstation——31 km