Power plant · Canterbury, England, United Kingdom

Nackington Farm Solar Park- Site C

Nackington Farm Solar Park- Site C is a cancelled solar power plant in Canterbury, England, United Kingdom, with 12 MW of capacity, operated by Green Energy UK Direct.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCanterbury (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNackington Farm, Nackington Road, Lower Hardres, CT4 7AFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 Jan 2014 (reference CA//14/00085, planning authority Canterbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Sept 2014 (withdrawn, reference CA//14/00085, planning authority Canterbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Energy UK Direct (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area21.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2483, 1.0906DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Canterbury, reference CA//14/00085)
  2. Permit applied for (planning authority Canterbury, reference CA//14/00085)

How it compares

Nackington Farm Solar Park- Site C is the 1,290th-largest of 4,035 power plants in England and the 2,106th-largest of 5,834 in the United Kingdom by capacity; its 12 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,290th of 4,035134,434 MW<0.1%
United Kingdom2,106th of 5,834200,500 MW<0.1%
All power plants in our data9,432nd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 5 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Richborough Connection ProjectTransmission line—Permitted13 km
The Bunker - South East Data CentreData center——15 km
Sota DatacentreData center——26 km
CustodianDC MaidstoneData center——38 km

Operator and place

More from Green Energy UK Direct

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page