Power plant · Thanet, England, United Kingdom

Minster Abbey, Bedlam Court Lane - Solar PV panels

Minster Abbey, Bedlam Court Lane - Solar PV panels is a solar power plant under construction in Thanet, England, United Kingdom, with 33 MW of capacity, operated by The Benedictine Nuns of St Mildreds Priory.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationThanet (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMinster Abbey Bedlam Court Lane, Ramsgate, CT12 4HFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Sept 2021 (reference F/TH/21/1365, planning authority Thanet)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorThe Benedictine Nuns of St Mildreds PrioryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity33 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.04 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3316, 1.3212DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit applied for (planning authority Thanet, reference F/TH/21/1365)

How it compares

Minster Abbey, Bedlam Court Lane - Solar PV panels is the 790th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,299th-largest of 2,548 in the United Kingdom by capacity; its 33 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England790th of 1,650171,264 MW<0.1%
United Kingdom1,299th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data2,687th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 2 data centers and 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Richborough Connection ProjectTransmission line—Permitted5.9 km
The Bunker - South East Data CentreData center——6.9 km
Sota DatacentreData center——41 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page