Power plant · Somerset, England, United Kingdom

Middle Drove and Porchestall Drove - Solar Array

Middle Drove and Porchestall Drove - Solar Array is a cancelled solar power plant in Somerset, England, United Kingdom, with 1.23 MW of capacity, operated by Avalon Community Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMiddle Drove & Porchestall Drove, Glastonbury, BA6 9LRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jun 2025 (reference 2025/1122/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Oct 2025 (refused, reference 2025/1122/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAvalon Community Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.23 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1476, -2.7295DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Somerset, reference 2025/1122/FUL)
  2. Permit applied for (planning authority Somerset, reference 2025/1122/FUL)

How it compares

Middle Drove and Porchestall Drove - Solar Array is the 3,770th-largest of 4,035 power plants in England and the 5,486th-largest of 5,834 in the United Kingdom by capacity; its 1.23 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,770th of 4,035134,434 MW<0.1%
United Kingdom5,486th of 5,834200,500 MW<0.1%
All power plants in our data15,226th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 95 grid connections (59 operating, 505 MW), 42 substations, 7 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fleet Air Arm Museum grid connectionGrid connection4.01 MWOperating16 km
Solar 1.254 MW grid connection at Castle CaryGrid connection1.25 MWOperating16 km
Southfield Farm Solar Park grid connectionGrid connection7.6 MWOperating17 km
Castle Cary PrimarySubstation——17 km
Sparkford PrimarySubstation——18 km
Tata Communications Highbridge DatacentreData center——19 km
Chilton Cantello PrimarySubstation——19 km
Hinkley Point C ConnectionTransmission line—Permitted21 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned23 km