Power plant · East Riding of Yorkshire, England, United Kingdom

Melton Waste Park

Melton Waste Park is a wind power plant in East Riding of Yorkshire, England, United Kingdom, with 5 MW of capacity, operated by Seneca Global Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Riding of Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand South West Of Melton Waste, Gibson Lane, Melton, North Ferriby, HU14 3HHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Apr 2015 (permit 14/03951/STPLFE, Town and Country Planning Act, issued by East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Feb 2015 (reference 14/03951/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Apr 2015 (granted, reference 14/03951/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSeneca Global EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units2 units (2.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7181, -0.5303DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority East Riding of Yorkshire, reference 14/03951/STPLFE)
  3. Permit applied for (planning authority East Riding of Yorkshire, reference 14/03951/STPLFE)

How it compares

Melton Waste Park is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,909th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 339 grid connections (169 operating, 2,501 MW), 162 substations, 2 transmission lines, 1 gas storage facility and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gibson LaneSubstation——0.4 km
Solar 4 MW grid connection at Gibson LaneGrid connection4 MWPlanned0.4 km
Battery storage and Solar and Wind 7.9 MW grid connection at Gibson LaneGrid connection7.9 MWPlanned0.7 km
Gibson Lane Wind Farm grid connectionGrid connection24 MWPlanned0.8 km
Skillings LaneSubstation——3.0 km
Hull WestSubstation——4.5 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled12 km
Aldbrough Hydrogen StorageGas storage facility—Planned31 km
North Humber to High MarnhamTransmission line—Planned36 km

Operator and place

More from Seneca Global Energy

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page