Power plant · Tunbridge Wells, England, United Kingdom

Maidstone Road, Horsmonden - Paddock Solar Farm

Maidstone Road, Horsmonden - Paddock Solar Farm is a power plant under construction in Tunbridge Wells, England, United Kingdom, with 49.9 MW of capacity, operated by Voltalia UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTunbridge Wells (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBockingfold Farm Maidstone Road Horsmonden, TN12 8DGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Sept 2023 (permit 22/02773/FULL, Town and Country Planning Act, issued by Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Sept 2022 (reference 22/02773/FULL, planning authority Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Sept 2023 (granted, reference 22/02773/FULL, planning authority Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Dec 2022 (refused, reference 22/02773/FULL, planning authority Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVoltalia UKDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area69.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1488, 0.4378DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Maidstone Road, Horsmonden - Paddock Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 29 data centers and 1 grid connection (6.94 MW), measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——16 km
CustodianDC MaidstoneData center——17 km
Sota DatacentreData center——27 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating46 km

Operator and place

More from Voltalia UK

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page