Power plant · West Northamptonshire, England, United Kingdom

Crick Solar Farm

Crick Solar Farm is a permitted power plant in West Northamptonshire, England, United Kingdom, with 49.9 MW of capacity, operated by Voltalia UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O Field View Cottage, Watling Street, Kilsby, Rugby, CV23 8UWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Jun 2024 (permit WND/2022/1084, Town and Country Planning Act, issued by West Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Jan 2023 (reference WND/2022/1084, planning authority West Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Jun 2024 (granted, reference WND/2022/1084, planning authority West Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVoltalia UKDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area54.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3292, -1.1496DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Crick Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 336 grid connections (6 operating, 39.3 MW), 9 data centers and 8 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Land OFF A5/KILSBY Road grid connectionGrid connection——0.2 km
Lodge Farm grid connectionGrid connection——1.8 km
Lodge Farm grid connectionGrid connection——1.8 km
Hellermann Tyton DataData center——19 km
Santander data center, EnglandData center——28 km
Data center, England (OSM way 710050084)Data center——28 km
Cottisford PrimarySubstation——39 km
Deddington PrimarySubstation——42 km
Upper Heyford PrimarySubstation——45 km

Operator and place

More from Voltalia UK

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page