Power plant · Uttlesford, England, United Kingdom

Maggots End Road, Berden - Solar Farm & Battery Storage

Maggots End Road, Berden - Solar Farm & Battery Storage is a cancelled power plant in Uttlesford, England, United Kingdom, with 49.9 MW of capacity, operated by Low Carbon.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUttlesford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPelham Substation Maggots End Road Manuden, CM23 1BJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 May 2025 (reference UTT/25/1224/FUL, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Jan 2026 (refused, reference UTT/25/1224/FUL, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow CarbonDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area64.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9284, 0.1522DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Maggots End Road, Berden - Solar Farm & Battery Storage is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England175th of 3,43071,985 MW<0.1%
United Kingdom362nd of 5,050115,642 MW<0.1%
All power plants in our data1,841st of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 55 data centers (1 operating, 88 MW), 2 transmission lines, 2 grid connections (1 operating, 6.94 MW) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Kao Data KLON-02Data center——18 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating18 km
Kao Data KLON-01Data center——18 km
Starwood HouseData center——25 km
North London (Electricity Line) ReinforcementTransmission line—Permitted39 km
Tertiary Study grid connectionGrid connection57 MWPlanned48 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating49 km
Bramford to TwinsteadTransmission line—Permitted49 km

Operator and place

More from Low Carbon

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page