Lovedean, Denmead - Solar farm & Battery storage is a planned power plant in East Hampshire, England, United Kingdom, with 49.9 MW of capacity, operated by Lovedean Green Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Hampshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressS/O Lovedean Electricity Sub Station, Broadway Lane, Lovedean, Waterlooville, PO8 0SJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Mar 2022 (reference 58038/003, planning authority East Hampshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLovedean Green Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area92 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9141, -1.0346DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority East Hampshire, reference 58038/003)

How it compares

Lovedean, Denmead - Solar farm & Battery storage is the 455th-largest of 1,651 power plants planned, permitted or under construction in England and the 801st-largest of 2,549 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England455th of 1,651172,174 MW<0.1%
United Kingdom801st of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data1,881st of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 208 grid connections (120 operating, 1,144 MW), 178 substations, 13 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 3.8 MW grid connection at HorndeanGrid connection3.8 MWOperating0.5 km
Lovedean GSPSubstation——0.5 km
Aquind InterconnectorTransmission line—Planned0.5 km
100MW BESS grid connectionGrid connection101 MWPlanned0.9 km
100MW BESS grid connectionGrid connection100 MWPlanned1.2 km
Horndean PrimarySubstation——2.3 km
Waterlooville PrimarySubstation——3.9 km