Power plant · Ashfield, England, United Kingdom

Long Lane Solar Farm / Nottingham Brick Works

Long Lane Solar Farm / Nottingham Brick Works is a power plant under construction in Ashfield, England, United Kingdom, with 17 MW of capacity, operated by Earthworm and EW Capital.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAshfield (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Off, Long Lane, Watnall, Nottingham, NG16 1HYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Nov 2015 (permit 15/00525/FUL, Town and Country Planning Act, issued by Broxtowe)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Jul 2015 (reference 15/00525/FUL, planning authority Broxtowe)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Nov 2015 (granted, reference 15/00525/FUL, planning authority Broxtowe)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEarthworm (Earthworm/ EW Capital)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEW Capital (Earthworm/ EW Capital)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity17 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0174, -1.2304DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Long Lane Solar Farm / Nottingham Brick Works is the 1,313th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,054th-largest of 3,222 in the United Kingdom by capacity; its 17 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,313th of 2,174186,088 MW<0.1%
United Kingdom2,054th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data4,269th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 69 substations, 55 grid connections (28 operating, 277 MW), 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten NottinghamData center——1.6 km
Chesterfield to WillingtonTransmission line—Planned14 km
ExperianData center——16 km
Digital Space DC - NewarkData center——30 km
Weston Marsh to East LeicestershireTransmission line—Planned31 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating34 km
DronfieldSubstation——35 km
Kiveton ParkSubstation——35 km
Wind 4.5 MW grid connection at Kiveton ParkGrid connection4.5 MWOperating35 km

Operators and place

More from Earthworm

Other power plants in England

All 5809 power plants in England, United Kingdom