Power plant · Wigan, England, United Kingdom
Lights Oaks Moss
Lights Oaks Moss is a cancelled power plant in Wigan, England, United Kingdom, with 5 MW of capacity, operated by Earthworm and EW Capital.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wigan (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Light Oaks Moss Farm, Old Moss Lane, Glazebury, Warrington, Cheshire, North West, WA3 5PY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (abandoned) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 22 Jan 2016 (permit A/15/81182/MAJOR, Town and Country Planning Act, issued by Wigan) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 23 Oct 2015 (reference A/15/81182/MAJOR, planning authority Wigan) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Jan 2016 (granted, reference A/15/81182/MAJOR, planning authority Wigan) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Earthworm (Earthworm/ EW Capital) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | EW Capital (Earthworm/ EW Capital) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 12.9 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.4669, -2.4753 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Wigan, reference A/15/81182/MAJOR)
- Permit applied for (planning authority Wigan, reference A/15/81182/MAJOR)
How it compares
Lights Oaks Moss is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,758th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 2,742nd of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 8,380th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 367 grid connections (200 operating, 1,757 MW), 367 substations, 19 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Dukinfield Farm grid connection | Grid connection | 10 MW | Planned | 2.3 km |
| Leigh WWTW grid connection | Grid connection | 2.34 MW | Operating | 2.8 km |
| Burneside Mill grid connection | Grid connection | 7 MW | Operating | 3.1 km |
| Culcheth | Substation | — | — | 3.2 km |
| Bedford | Substation | — | — | 3.8 km |
| Leigh | Substation | — | — | 4.1 km |
| Data center, England (OSM way 1535147042) | Data center | — | — | 7.2 km |
| Verizon Warrington | Data center | — | — | 9.8 km |
| Data center, England (OSM way 1551100328) | Data center | — | — | 11 km |
Operators and place
More from Earthworm
- Long Lane Solar Farm / Nottingham Brick Works17 MW · under construction
- Maesygarn10 MW
- Land at Borras Hall10 MW
- Celyn Farm5 MW
- Land south of Ramsdale Park Golf Course4 MW
- Land North East Of Heath Farm2.8 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.