Power plant · Liverpool, England, United Kingdom

Lister Battery Limited - Battery Energy Storage System

Lister Battery Limited - Battery Energy Storage System is a permitted power plant in Liverpool, England, United Kingdom, with 6 MW of capacity, operated by Lister Battery Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLiverpool (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address126 Green Lane, Tuebrook, Liverpool, L13 7EDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date23 Apr 2025 (permit 24F/2904, Town and Country Planning Act, issued by Liverpool)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Nov 2024 (reference 24F/2904, planning authority Liverpool)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Apr 2025 (granted, reference 24F/2904, planning authority Liverpool)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLister Battery LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.4171, -2.9177DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Liverpool, reference 24F/2904)
  2. Permit applied for (planning authority Liverpool, reference 24F/2904)

How it compares

Lister Battery Limited - Battery Energy Storage System is the 1,576th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,433rd-largest of 3,222 in the United Kingdom by capacity; its 6 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,576th of 2,174185,888 MW<0.1%
United Kingdom2,433rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,556th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 240 grid connections (141 operating, 1,234 MW), 235 substations, 17 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten Edge Data Centre LiverpoolData center——9.0 km
Bickerstaffe WTW grid connectionGrid connection1.25 MWOperating13 km
Bold GSPSubstation——15 km
The Babbage CentreData center——16 km
Pimbo Road grid connectionGrid connection21.1 MWOperating16 km
Billinge Hill Quarry Landfill grid connectionGrid connection1.03 MWOperating16 km
PimboSubstation——17 km
OrmskirkSubstation——17 km
Iron MountainData center——19 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom