Power plant · South Kesteven, England, United Kingdom
Limes Farm Solar Farm & Battery Energy Storage
Limes Farm Solar Farm & Battery Energy Storage is a permitted power plant in South Kesteven, England, United Kingdom, with 20 MW of capacity, operated by Downing Limited Liability Partnership.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Kesteven (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Limes Solar Farm On Lands Circa 0.5km North Of Limes Farm Bourne, PE10 0BB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 12 May 2025 (permit S24/2191, Town and Country Planning Act, issued by South Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 7 Feb 2025 (reference S24/2191, planning authority South Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 12 May 2025 (granted, reference S24/2191, planning authority South Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Downing Limited Liability Partnership | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 20 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 34.6 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.7723, -0.2871 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority South Kesteven, reference S24/2191)
- Permit applied for (planning authority South Kesteven, reference S24/2191)
How it compares
Limes Farm Solar Farm & Battery Energy Storage is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,200th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 1,875th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,872nd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 5 data centers and 4 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Triton Knoll Electrical System | Transmission line | — | Permitted | 18 km |
| Data center, England (OSM way 87850427) | Data center | — | — | 24 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 26 km |
| Positive Park | Data center | — | — | 31 km |
| The Horizon Centre | Data center | — | — | 37 km |
| Kings Lynn B Connection Project | Transmission line | — | Permitted | 45 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.