Power plant · Wiltshire, England, United Kingdom
Lime Down - Battery Storage
Lime Down - Battery Storage is a planned power plant in Wiltshire, England, United Kingdom, with 500 MW of capacity, operated by Island Green Power.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wiltshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | W/O Corston, N/O Hullavington, Chippenham, SN16 0PU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Part of | Lime Down Solar Project (matched by planning reference) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Application date | 17 Oct 2025 (reference EN010168, planning authority The Planning Inspectorate - National Infrastructure) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Island Green Power | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 500 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.5614, -2.1966 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant and the records linked to it from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority The Planning Inspectorate - National Infrastructure, reference EN010168)
- Permit applied for: Lime Down Solar Project (planning authority The Planning Inspectorate, reference EN010168) · source
How it compares
Lime Down - Battery Storage is the 70th-largest of 2,174 power plants planned, permitted or under construction in England and the 107th-largest of 3,222 in the United Kingdom by capacity; its 500 MW is 0.17% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 70th of 2,174 | 185,888 MW | 0.27% |
| United Kingdom | 107th of 3,222 | 300,461 MW | 0.17% |
| All power plants planned, permitted or under construction in our data | 249th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 140 grid connections (89 operating, 1,059 MW), 73 substations, 8 data centers, 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Alderton Primary | Substation | — | — | 2.0 km |
| Hullavington PV Farm grid connection | Grid connection | 6.65 MW | Operating | 3.9 km |
| 40MW grid connection | Grid connection | 40 MW | Planned | 5.8 km |
| Malmesbury Primary | Substation | — | — | 6.4 km |
| Rodbourne Rail Business Centre grid connection | Grid connection | 6.18 MW | Operating | 7.3 km |
| Sutton Benger Primary | Substation | — | — | 8.3 km |
| Ark Data Centres | Data center | — | — | 16 km |
| Data center, England (OSM way 996865179) | Data center | — | — | 16 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 21 km |
Operator and place
More from Island Green Power
- Cottam Solar Project600 MW · permitted
- Green Hill Solar Farm & Battery Storage600 MW · planned
- Green Hill Solar Farm & Battery Storage600 MW · planned
- Lime Down - Solar Project500 MW · planned
- East Pye Solar Farm500 MW · planned
- Abbotshaugh Battery Storage500 MW · planned
- The Droves Solar Farm500 MW · planned
- West Burton Solar Project480 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.