Substation · England, United Kingdom

Sutton Benger Primary

Sutton Benger Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 7.5 / 15MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromChippenham BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromMelksham GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementReplace both transformers with 15 / 30MVA units (due Jan 2028)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map, limited by substation thermal capacity & upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5193, -2.0966SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 413 power plants (158 operating, 1,919 MW), 318 grid connections (95 operating, 1,107 MW), 8 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chissell Brook Solar and Storage grid connectionGrid connection25 MWPlanned1.8 km
Lake PV Farm grid connectionGrid connection4.28 MWOperating2.1 km
Lake FarmPower plant5 MWOperating2.4 km
Red Barn - Solar Farm & Battery StoragePower plant40 MWPermitted2.8 km
Red Barn - Solar Farm & Battery StoragePower plant40 MWPermitted2.8 km
AH Red Barn Solar grid connectionGrid connection40 MWPlanned3.6 km
Ark Data CentresData center——14 km
Data center, England (OSM way 996865179)Data center——14 km
VodafoneData center——18 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1666 substations in England, United Kingdom