Power plant · Arun, England, United Kingdom

Lidsey Landfill

Lidsey Landfill is a power plant in Arun, England, United Kingdom, with 1.4 MW of capacity, operated by Lidsey Landfill Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationArun (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHeadhome Farm, Near Bognor Regis,DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2002DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Nov 1996 (permit AL/57/96, Town and Country Planning Act, issued by Arun)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Nov 1996 (granted, reference AL/57/96, planning authority Arun)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLidsey Landfill LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8229, -0.6780DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Arun, reference AL/57/96)

How it compares

Lidsey Landfill is the 3,139th-largest of 3,430 power plants in England and the 4,668th-largest of 5,050 in the United Kingdom by capacity; its 1.4 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,139th of 3,43071,965 MW<0.1%
United Kingdom4,668th of 5,050115,622 MW<0.1%
All power plants in our data11,288th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 119 grid connections (70 operating, 624 MW), 101 substations, 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Landfill gas 1.9 MW grid connection at ChichesterGrid connection1.9 MWOperating0.5 km
Land at Manor Farm 3 grid connectionGrid connection18 MWPlanned1.3 km
Land at Manor Farm grid connectionGrid connection3.5 MWPlanned1.3 km
South Bersted PrimarySubstation——2.8 km
Chichester BSPSubstation——4.1 km
Chichester PrimarySubstation——4.1 km
SSE data center, HavantData center——21 km
Aquind InterconnectorTransmission line—Planned27 km
IBM HorshamData center——32 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page