Power plant · Central Bedfordshire, England, United Kingdom

Leighton Road & Hawthorn - Solar Panels

Leighton Road & Hawthorn - Solar Panels is a permitted power plant in Central Bedfordshire, England, United Kingdom, with 20 MW of capacity, operated by Econergy International Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth of Leighton Road and West of Hawthorn, LU7 9PADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Jul 2025 (permit CB/22/04934/FULL, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Feb 2023 (reference CB/22/04934/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Jul 2025 (granted, reference CB/22/04934/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEconergy International LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area32.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9202, -0.6138DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Leighton Road & Hawthorn - Solar Panels is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174186,088 MW<0.1%
United Kingdom1,875th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 160 grid connections (32 operating, 342 MW), 95 substations and 82 data centers (1 operating, 88 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——8.1 km
Bletchley Landfill Site grid connectionGrid connection——10 km
Milton Keynes, Woburn Sands grid connectionGrid connection——11 km
Fenny Lock, Bletcham Way, Milton Keynes grid connectionGrid connection——12 km
Data center, England (OSM way 1254986167)Data center——14 km
Pulsant Milton Keynes SE-1Data center——18 km
East Claydon GSPSubstation——20 km
Cokes Lane PrimarySubstation——28 km
Amersham GSPSubstation——29 km

Operator and place

More from Econergy International Limited

Other power plants in England

All 5809 power plants in England, United Kingdom