Power plant · New Forest, England, United Kingdom

Land South Of Carlton House

Land South Of Carlton House is a cancelled power plant in New Forest, England, United Kingdom, with 2.2 MW of capacity, operated by West Solent Solar Cooperative.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNew Forest (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand South Of Carlton House, Ringwood Road, Woodlands, Southampton, SO40 7HTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Oct 2015 (reference 15/00787, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Dec 2015 (refused, reference 15/00787, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWest Solent Solar CooperativeDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9143, -1.5363DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority New Forest, reference 15/00787)
  2. Permit applied for (planning authority New Forest, reference 15/00787)

How it compares

Land South Of Carlton House is the 2,755th-largest of 3,430 power plants in England and the 4,109th-largest of 5,050 in the United Kingdom by capacity; its 2.2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,755th of 3,43071,965 MW<0.1%
United Kingdom4,109th of 5,050115,622 MW<0.1%
All power plants in our data10,301st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 218 grid connections (125 operating, 1,167 MW), 186 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fletchwood PrimarySubstation——1.3 km
5.88MW BESS grid connectionGrid connection5.88 MWPlanned1.3 km
Fletchwood Solar Farm grid connectionGrid connection5 MWPlanned1.3 km
Totton PrimarySubstation——3.2 km
Butts Field Energy Storage grid connectionGrid connection99 MWPlanned4.1 km
Nursling GSPSubstation——4.5 km
Sky ChilworthData center——9.3 km
Regit4uData center——20 km
SCCData center——21 km

Operator and place

More from West Solent Solar Cooperative

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page