Power plant · Stratford-on-Avon, England, United Kingdom

Land On The East Side Of Fosse Way

Land On The East Side Of Fosse Way is a power plant in Stratford-on-Avon, England, United Kingdom, with 10 MW of capacity, operated by Anesco.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStratford-on-Avon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand On The East Side Of Fosse Way, Radford Semele, Leamington Spa, CV31 1XJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Nov 2015 (permit 15/02716/FUL, Town and Country Planning Act, issued by Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jul 2015 (reference 15/02716/FUL, planning authority Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Nov 2015 (granted, reference 15/02716/FUL, planning authority Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAnescoDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area16 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2543, -1.4779DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Land On The East Side Of Fosse Way is the 1,102nd-largest of 3,430 power plants in England and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,102nd of 3,43071,985 MW<0.1%
United Kingdom1,838th of 5,050115,642 MW<0.1%
All power plants in our data7,057th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 15/02716/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 23 grid connections (11 operating, 83 MW), 13 substations and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Evoque Data Center SolutionsData center——28 km
Data center, England (OSM way 710050084)Data center——33 km
Deddington PrimarySubstation——33 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating34 km
Duns TEW Solar Farm grid connectionGrid connection6 MWPlanned34 km
Spring Farm grid connectionGrid connection13.2 MWPlanned35 km
Chipping Norton PrimarySubstation——35 km
Hellermann Tyton DataData center——38 km
Kiddington PrimarySubstation——38 km

Operator and place

More from Anesco

Other power plants in England

All 5809 power plants in England, United Kingdom