Power plant · Cornwall, England, United Kingdom

Land At Woodlands Farm

Land At Woodlands Farm is a cancelled solar power plant in Cornwall, England, United Kingdom, with 8 MW of capacity, operated by Kronos Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCornwall (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Tamerton Holsworthy, EX22 6SQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jan 2013 (reference PA12/12014, planning authority Cornwall)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Jan 2014 (refused, reference PA12/12014, planning authority Cornwall)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKronos Solar (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7734, -4.4058DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Cornwall, reference PA12/12014)
  2. Permit applied for (planning authority Cornwall, reference PA12/12014)

How it compares

Land At Woodlands Farm is the 1,732nd-largest of 4,035 power plants in England and the 2,693rd-largest of 5,834 in the United Kingdom by capacity; its 8 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,732nd of 4,035134,434 MW<0.1%
United Kingdom2,693rd of 5,834200,500 MW<0.1%
All power plants in our data11,123rd of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 1 data center and 1 mine, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Data center, England (OSM way 164113041)Data center——16 km
Tungsten WestMine——48 km

Operator and place

More from Kronos Solar

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page