Power plant · Blaby, England, United Kingdom
Land at and adjacent to Leicester Forest Services
Land at and adjacent to Leicester Forest Services is a power plant in Blaby, England, United Kingdom, with 1.5 MW of capacity, operated by Camborne Energy Storage.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Blaby (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Leicester Forest East Services (Baines Lane), Adjoining Land And Land Adjacent To 61 Goodheart Way, LE3 3GB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2021 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 7 Feb 2022 (permit 17/0936/FUL, Town and Country Planning Act, issued by Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 16 Jun 2017 (reference 17/0936/FUL, planning authority Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 7 Feb 2022 (granted, reference 17/0936/FUL, planning authority Blaby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Camborne Energy Storage | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.6198, -1.2026 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Land at and adjacent to Leicester Forest Services is the 3,048th-largest of 3,430 power plants in England and the 4,531st-largest of 5,050 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,048th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,531st of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 11,060th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
- Permit issued (Town and Country Planning Act), no. 17/0936/FUL
Nearby
Within 50 km of this power plant: 367 grid connections, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Leicester, Casepack, 60, Sunningdale Road, Leicester, Leicestershire, LE3 1UX grid connection | Grid connection | — | — | 1.2 km |
| Desford Road BESS grid connection | Grid connection | — | — | 2.8 km |
| Next Enderby grid connection | Grid connection | — | — | 2.9 km |
| Santander data center, England | Data center | — | — | 4.1 km |
| Santander data center, England | Data center | — | — | 4.6 km |
| Data center, England (OSM way 710050084) | Data center | — | — | 15 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 26 km |
| Chesterfield to Willington | Transmission line | — | Planned | 49 km |
Operator and place
More from Camborne Energy Storage
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.