Power plant · Basingstoke and Deane, England, United Kingdom

Chineham Battery Energy Storage Facility

Chineham Battery Energy Storage Facility is a cancelled power plant in Basingstoke and Deane, England, United Kingdom, with 15 MW of capacity, operated by Camborne Energy Storage.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBasingstoke and Deane (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand off Carpenters Down, Basingstoke, RG24 9PJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Jul 2016 (reference 16/02534/FUL, planning authority Basingstoke and Deane)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Jan 2017 (withdrawn, reference 16/02534/FUL, planning authority Basingstoke and Deane)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCamborne Energy StorageDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2892, -1.0751DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Basingstoke and Deane, reference 16/02534/FUL)
  2. Permit applied for (planning authority Basingstoke and Deane, reference 16/02534/FUL)

How it compares

Chineham Battery Energy Storage Facility is the 774th-largest of 3,430 power plants in England and the 1,388th-largest of 5,050 in the United Kingdom by capacity; its 15 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England774th of 3,43071,965 MW<0.1%
United Kingdom1,388th of 5,050115,622 MW<0.1%
All power plants in our data5,118th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 260 substations, 239 grid connections (121 operating, 1,310 MW), 80 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chineham PrimarySubstation——1.1 km
Basingstoke Power Stor grid connectionGrid connection16 MWOperating1.5 km
Oarkridge PrimarySubstation——1.6 km
Vyne Road grid connectionGrid connection41.6 MWPlanned2.1 km
Basingstoke (T3 & T4) BSPSubstation——2.2 km
Basing Road Battery Storage - 20MW grid connectionGrid connection20 MWPlanned2.2 km
Redcentric ReadingData center——16 km
Pulsant Reading SL3Data center——17 km
Asanti - ReadingData center——17 km

Operator and place

More from Camborne Energy Storage

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page