Power plant · Buckinghamshire, England, United Kingdom

Land Adjacent to A422 Solar Farm

Land Adjacent to A422 Solar Farm is a cancelled solar power plant in Buckinghamshire, England, United Kingdom, with 3.4 MW of capacity, operated by Lark Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBuckinghamshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Adjacent To Brackley Road, Turweston, BuckinghamshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Oct 2013 (reference 13/02921/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Jan 2014 (withdrawn, reference 13/02921/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLark Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0240, -1.1302DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Buckinghamshire, reference 13/02921/APP)
  2. Permit applied for (planning authority Buckinghamshire, reference 13/02921/APP)

How it compares

Land Adjacent to A422 is the 2,955th-largest of 4,036 power plants in England and the 4,306th-largest of 5,837 in the United Kingdom by capacity; its 3.4 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,955th of 4,036134,406 MW<0.1%
United Kingdom4,306th of 5,837200,833 MW<0.1%
All power plants in our data10,394th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 82 grid connections (34 operating, 317 MW), 55 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cottisford PrimarySubstation——5.5 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating5.9 km
Tritax Symmetry Park grid connectionGrid connection15 MWPlanned9.1 km
Waste 1.188 MW grid connection at Upper HeyfordGrid connection1.19 MWOperating12 km
Bicester North PrimarySubstation——13 km
Bicester North BSPSubstation——13 km
nLighten Milton KeynesData center——21 km
Data center, England (OSM way 460010263)Data center——26 km
Pulsant Milton Keynes SE-1Data center——26 km

Operator and place

More from Lark Energy

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page