Power plant · Bristol, City of, England, United Kingdom

Kings Weston Lane - Battery Energy Storage System

Kings Weston Lane - Battery Energy Storage System is a permitted power plant in Bristol, City of, England, United Kingdom, with 20 MW of capacity, operated by Fig Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBristol, City of (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressKings Weston Lane, Avonmouth, Bristol, BS11 0YSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Mar 2026 (permit 24/04429/F, Town and Country Planning Act, issued by Bristol, City of)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Nov 2024 (reference 24/04429/F, planning authority Bristol, City of)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Mar 2026 (granted, reference 24/04429/F, planning authority Bristol, City of)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFig PowerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5155, -2.6711DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Kings Weston Lane - Battery Energy Storage System is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174186,088 MW<0.1%
United Kingdom1,875th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 379 grid connections (46 operating, 614 MW), 30 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Bristol Avonmouth Kingsweston LN Import/Export 2nd Site grid connectionGrid connection——0.5 km
Avonmouth Waste Water Treatment Works grid connectionGrid connection——0.5 km
T J Transport grid connectionGrid connection——0.5 km
nLighten BristolData center——6.8 km
Hinkley Point C ConnectionTransmission line—Permitted21 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned23 km
Insight Data LtdData center——24 km
Vantage Data Centers - CWL13Data center——25 km
Alderton PrimarySubstation——31 km

Operator and place

More from Fig Power

Other power plants in England

All 5809 power plants in England, United Kingdom