Power plant · Knowsley, England, United Kingdom

Jaguar Land Rover Jaguar Plant, North Road - Solar Panels

Jaguar Land Rover Jaguar Plant, North Road - Solar Panels is a permitted power plant in Knowsley, England, United Kingdom, with 9.3 MW of capacity, operated by Jaguar Land Rover.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationKnowsley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressJaguar Land Rover Jaguar Plant North Road Halewood, L24 9BJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Feb 2025 (permit 24/00659/PDS, Town and Country Planning Act, issued by Knowsley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Dec 2024 (reference 24/00659/PDS, planning authority Knowsley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Feb 2025 (granted, reference 24/00659/PDS, planning authority Knowsley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorJaguar Land RoverDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity9.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.3513, -2.8319DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Jaguar Land Rover Jaguar Plant, North Road - Solar Panels is the 1,509th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,337th-largest of 3,222 in the United Kingdom by capacity; its 9.3 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,509th of 2,174186,088 MW<0.1%
United Kingdom2,337th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,429th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 249 substations, 242 grid connections (142 operating, 1,172 MW), 17 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
The Babbage CentreData center——7.2 km
nLighten Edge Data Centre LiverpoolData center——9.4 km
Bold GSPSubstation——13 km
nLighten ChesterData center——13 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned17 km
Amazon Man 8 grid connectionGrid connection1.39 MWPlanned17 km
Lymes Wood Landfill Site grid connectionGrid connection1.17 MWOperating18 km
Newton Le WillowsSubstation——18 km
HaydockSubstation——19 km

Operator and place

More from Jaguar Land Rover

Other power plants in England

All 5809 power plants in England, United Kingdom