Power plant · Brentwood, England, United Kingdom
Hutton Battery Storage (Lower Road)
Hutton Battery Storage (Lower Road) is a power plant in Brentwood, England, United Kingdom, with 10 MW of capacity, operated by Gore Street Capital and Flexitricity.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Brentwood (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land West Of Wash Road Hutton, CM13 1TB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2020 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 15 Dec 2017 (permit 17/01477/FUL, Town and Country Planning Act, issued by Brentwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 29 Sept 2017 (reference 17/01477/FUL, planning authority Brentwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 15 Dec 2017 (granted, reference 17/01477/FUL, planning authority Brentwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Gore Street Capital (Gore Street Capital / Flexitricity Limited) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Flexitricity (Gore Street Capital / Flexitricity Limited) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6381, 0.3606 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Hutton Battery Storage (Lower Road) is the 1,102nd-largest of 3,430 power plants in England and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,102nd of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 1,838th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 7,057th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 17/01477/FUL
- Started operating
Nearby
Within 50 km of this power plant: 72 data centers (1 operating, 88 MW), 19 substations, 3 grid connections (2 operating, 9.14 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Imperium 315 | Data center | — | — | 10 km |
| NTT London 1 | Data center | — | — | 16 km |
| Fujitsu Data Centre | Data center | — | — | 19 km |
| NVIDIA Cambridge-1 | AI supercomputer | 202 H100e | Operating | 21 km |
| Solar 6.935 MW grid connection at Maiden Newton | Grid connection | 6.94 MW | Operating | 26 km |
| North London (Electricity Line) Reinforcement | Transmission line | — | Permitted | 28 km |
| Tertiary Study grid connection | Grid connection | 57 MW | Planned | 34 km |
| Ariel Way White City London grid connection | Grid connection | 2.2 MW | Operating | 43 km |
| Willesden GSP | Substation | — | — | 44 km |
Operators and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.