Power plant · Tameside, England, United Kingdom
Holden Way
Holden Way is a permitted power plant in Tameside, England, United Kingdom, with 6 MW of capacity, operated by STOR Power.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Tameside (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land Off Holden Way, Dukinfield, Greater Manchester, SK16 5LP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 25 Jun 2018 (permit 17/00846/FUL, Town and Country Planning Act, issued by Tameside) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 10 Apr 2017 (reference 17/00846/FUL, planning authority Tameside) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 25 Jun 2018 (granted, reference 17/00846/FUL, planning authority Tameside) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | STOR Power | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 6 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.4830, -2.0749 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Holden Way is the 1,576th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,433rd-largest of 3,222 in the United Kingdom by capacity; its 6 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,576th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,433rd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,556th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 535 substations, 466 grid connections (250 operating, 2,214 MW), 22 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Sandy Lane grid connection | Grid connection | 21.1 MW | Planned | 0.0 km |
| Tame Power grid connection | Grid connection | 4.6 MW | Planned | 0.3 km |
| Tame Valley | Substation | — | — | 0.4 km |
| Land West of Clarence Street grid connection | Grid connection | 2.5 MW | Planned | 0.4 km |
| Ashton Under Lyne T13 | Substation | — | — | 1.9 km |
| Ashton Under Lyne T11 & T12 | Substation | — | — | 1.9 km |
| Data center, England (OSM way 703959498) | Data center | — | — | 6.9 km |
| CDL Strata Campus Data Centre | Data center | — | — | 11 km |
| Asanti Manchester | Data center | — | — | 11 km |
Operator and place
More from STOR Power
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.