Power plant · Cheshire West and Chester, England, United Kingdom
High Street - Solar Farm
High Street - Solar Farm is a permitted power plant in Cheshire West and Chester, England, United Kingdom, with 17.6 MW of capacity, operated by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cheshire West and Chester (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | S/O High Street, Clotton, Tarporley, CW6 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 11 Oct 2022 (permit 21/04362/FUL, Town and Country Planning Act, issued by Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Oct 2021 (reference 21/04362/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 11 Oct 2022 (granted, reference 21/04362/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anesco | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 17.6 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 37 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1576, -2.6959 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Cheshire West and Chester, reference 21/04362/FUL)
- Permit applied for (planning authority Cheshire West and Chester, reference 21/04362/FUL)
How it compares
High Street - Solar Farm is the 1,310th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,050th-largest of 3,222 in the United Kingdom by capacity; its 17.6 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,310th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 2,050th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,208th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 164 substations, 160 grid connections (96 operating, 718 MW), 18 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 16 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 18 km |
| nLighten Chester | Data center | — | — | 18 km |
| The Babbage Centre | Data center | — | — | 19 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 19 km |
| nLighten Edge Data Centre Liverpool | Data center | — | — | 28 km |
| Rixton Old Hall grid connection | Grid connection | 1.03 MW | Operating | 31 km |
| Chelford | Substation | — | — | 31 km |
| Bold GSP | Substation | — | — | 31 km |
Operator and place
More from Anesco
- Persley BESS - Battery Storage70.1 MW · permitted
- Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery Storage50 MW · planned
- Newton Wood Farm49.9 MW · permitted
- Rothienorman - Battery Storage49.9 MW · permitted
- Turf Carr Solar Farm49.9 MW · permitted
- Overton Grange, Overton Road - Solar Farm Battery Energy Storage49.9 MW · planned
- Low Farm Solar Farm49.9 MW · under construction
- Brentwood nergy Storage System49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.