Power plant · Bassetlaw, England, United Kingdom

High Marnham - Solar Photovoltaic Farm

High Marnham - Solar Photovoltaic Farm is a permitted power plant in Bassetlaw, England, United Kingdom, with 42.7 MW of capacity, operated by J G Pears Property Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBassetlaw (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdj Former High Marnham Power Station High Marnham, NG23 6SHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Jan 2023 (permit 22/00707/FUL, Town and Country Planning Act, issued by Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 May 2022 (reference 22/00707/FUL, planning authority Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Jan 2023 (granted, reference 22/00707/FUL, planning authority Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorJ G Pears Property LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity42.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area58.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2280, -0.7986DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Bassetlaw, reference 22/00707/FUL)
  2. Permit applied for (planning authority Bassetlaw, reference 22/00707/FUL)

How it compares

High Marnham - Solar Photovoltaic Farm is the 825th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,321st-largest of 3,222 in the United Kingdom by capacity; its 42.7 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England825th of 2,174185,888 MW<0.1%
United Kingdom1,321st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,484th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 156 grid connections (80 operating, 1,048 MW), 120 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hall Water Treatment Works grid connectionGrid connection1.6 MWOperating4.4 km
Newton on Trent Water Works grid connectionGrid connection3.1 MWOperating5.8 km
StowSubstation——13 km
Stow Park Road grid connectionGrid connection1.19 MWOperating13 km
Digital Space DC - NewarkData center——17 km
Lea RoadSubstation——18 km
Corringham RoadSubstation——20 km
North Humber to High MarnhamTransmission line—Planned26 km
ThalesData center——37 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page