Power plant · County Durham, England, United Kingdom
High Hedley Hope 2 (Extension)
High Hedley Hope 2 (Extension) is a power plant in County Durham, England, United Kingdom, with 5.2 MW of capacity, operated by EDF Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | County Durham (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | High Hedley Farm, Tow Law, Bishop Auckland, County Durham | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2008 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 6 Jul 2005 (Town and Country Planning Act, issued by County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 12 Aug 2004 (planning authority County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Jul 2005 (granted, planning authority County Durham) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | EDF Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5.2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 4 units (1.3 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.7648, -1.7544 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
High Hedley Hope 2 (Extension) is the 1,737th-largest of 3,430 power plants in England and the 2,714th-largest of 5,050 in the United Kingdom by capacity; its 5.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,737th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,714th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 8,313th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act)
- Started operating
Nearby
Within 50 km of this power plant: 280 grid connections (139 operating, 1,410 MW), 166 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hedley Hope Farm grid connection | Grid connection | 49.5 MW | Planned | 0.9 km |
| Wind 4.94 MW grid connection at Brancepeth | Grid connection | 4.94 MW | Operating | 0.9 km |
| Wind 7.6 MW grid connection at Meadowfield | Grid connection | 7.6 MW | Operating | 3.1 km |
| Brancepeth | Substation | — | — | 5.8 km |
| Meadowfield | Substation | — | — | 9.4 km |
| Annfield | Substation | — | — | 9.6 km |
| DXC Wynyard Data Center | Data center | — | — | 32 km |
| Stellium Newcastle Campus | Data center | — | — | 32 km |
| Pulsant data center, England | Data center | — | — | 37 km |
Operator and place
More from EDF Energy
- West Burton C power station299 MW · permitted
- Dunside Wind Farm108 MW · permitted
- Stranoch 284 MW · permitted
- Cottam Power Station49 MW · permitted
- Dunside Wind Farm20 MW · permitted
- Stranoch 220 MW · under construction
- Broom Hill Farm8 MW
- Langley Moor8 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.