Power plant · Tewkesbury, England, United Kingdom

Hayden Hill Fruit Farm

Hayden Hill Fruit Farm is a cancelled solar power plant in Tewkesbury, England, United Kingdom, with 5 MW of capacity, operated by Blue Planet Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTewkesbury (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHayden Hill Fruit Farm, Old Gloucester Road, Hayden, CheltenhamDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Sept 2015 (reference 15/00982/FUL, planning authority Tewkesbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Apr 2016 (refused, reference 15/00982/FUL, planning authority Tewkesbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBlue Planet Solar (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area15.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9162, -2.1357DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Tewkesbury, reference 15/00982/FUL)
  2. Permit applied for (planning authority Tewkesbury, reference 15/00982/FUL)

How it compares

Hayden Hill Fruit Farm is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,909th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 82 grid connections (50 operating, 670 MW), 50 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Shipton Oliffe PrimarySubstation——14 km
Northleach PrimarySubstation——22 km
Whiteway PrimarySubstation——24 km
DXC TechnologyData center——25 km
Bathurst Estates grid connectionGrid connection49.9 MWOperating25 km
Cirencester Solar Park grid connectionGrid connection25 MWPlanned25 km
Crucis Park Estate LLP grid connectionGrid connection12.6 MWPlanned26 km
Ionos data center, EnglandData center——32 km
Nationwide Swindon Technology CentreData center——43 km

Operator and place

More from Blue Planet Solar

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page