Power plant · County Durham, England, United Kingdom

Hawthorn Pit -Solar Farm

Hawthorn Pit -Solar Farm is a permitted power plant in County Durham, England, United Kingdom, with 49.9 MW of capacity, operated by Aura Power Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCroup Hill South Of Beaconsyde Farm Broadoaks Murton, SR7 9SFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 May 2023 (permit DM/21/03420/FPA, Town and Country Planning Act, issued by County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Oct 2021 (ref. DM/21/03420/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 May 2023 (granted, ref. DM/21/03420/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 May 2023 (appeal granted, ref. DM/21/03420/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jul 2022 (refused, ref. DM/21/03420/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAura Power Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area52.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.8111, -1.4017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Hawthorn Pit -Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 283 grid connections (144 operating, 1,784 MW) and 166 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Hawthorn Pit GridSubstation——0.5 km
Hawthorn PitSubstation——0.6 km
Wind 2.47 MW grid connection at Hawthorn PitGrid connection2.47 MWOperating0.6 km
Solar 45 MW grid connection at Murton Solar FarmGrid connection45 MWPlanned0.9 km
Battery storage and Solar 118.5 MW grid connection at Salters Lane PVGrid connection119 MWPlanned1.0 km
Stoney CutSubstation——2.8 km

Operator and place

More from Aura Power Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom