Power plant · Stafford, England, United Kingdom

Hanyards Lane, Tixall - Solar Energy Park

Hanyards Lane, Tixall - Solar Energy Park is a permitted power plant in Stafford, England, United Kingdom, with 49.5 MW of capacity.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStafford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Jun 2024 (permit 23/37621/FUL, Town and Country Planning Act, issued by Stafford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Jun 2023 (reference 23/37621/FUL, planning authority Stafford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jun 2024 (granted, reference 23/37621/FUL, planning authority Stafford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area62 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8143, -2.0557DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Stafford, reference 23/37621/FUL)
  2. Permit applied for (planning authority Stafford, reference 23/37621/FUL)

How it compares

Hanyards Lane, Tixall - Solar Energy Park is the 769th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,224th-largest of 3,222 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England769th of 2,174185,888 MW<0.1%
United Kingdom1,224th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,306th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 4 grid connections (3 operating, 5.07 MW), 3 data centers, 2 substations, 1 gas storage facility and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Internet Central data center, EnglandData center——26 km
Hutchison 3GData center——30 km
EE Data CentreData center——32 km
Salinae Hydrogen Storage projectGas storage facility—Planned45 km
Dane Moss Solar PV grid connectionGrid connection7.5 MWPlanned48 km
Chesterfield to WillingtonTransmission line—Planned48 km
Danes Moss Landfill Site 2 grid connectionGrid connection2.1 MWOperating48 km
Danes Moss Landfill Site 3 grid connectionGrid connection1.01 MWOperating48 km
S.E. MacclesfieldSubstation——49 km

Place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page