Power plant · Central Bedfordshire, England, United Kingdom

Grounds Farm - Solar farm

Grounds Farm - Solar farm is a cancelled power plant in Central Bedfordshire, England, United Kingdom, with 20 MW of capacity, operated by Encavis.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at Grounds Farm, Church End, Hockliffe, Leighton Buzzard, LU7 9NLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Oct 2021 (permit CB/21/01571/FULL, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Apr 2021 (reference CB/21/01571/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Oct 2021 (granted, reference CB/21/01571/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEncavis (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area37.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9331, -0.5994DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Central Bedfordshire, reference CB/21/01571/FULL)
  2. Permit applied for (planning authority Central Bedfordshire, reference CB/21/01571/FULL)

How it compares

Grounds Farm - Solar farm is the 799th-largest of 3,953 power plants in England and the 1,379th-largest of 5,723 in the United Kingdom by capacity; its 20 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England799th of 3,95385,679 MW<0.1%
United Kingdom1,379th of 5,723136,106 MW<0.1%
All power plants in our data4,231st of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 76 substations, 70 data centers (1 operating, 88 MW) and 59 grid connections (29 operating, 292 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——7.8 km
Data center, England (OSM way 1254986167)Data center——16 km
Pulsant Milton Keynes SE-1Data center——17 km
East Claydon GSPSubstation——21 km
Cokes Lane PrimarySubstation——30 km
Amersham GSPSubstation——30 km
Generation 99 MW grid connection at Amersham MainGrid connection99 MWPlanned31 km
Pembridge Farm grid connectionGrid connection131 MWPlanned31 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned33 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom