Power plant · Gateshead, England, United Kingdom

Greenhead Energy Park

Greenhead Energy Park is a planned battery storage plant in Gateshead, England, United Kingdom, with 13 MW of capacity, operated by Exagen.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationGateshead (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWest Of Coalburns Substation And North West Of Chopwell, NE17 7EZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 May 2024 (reference DC/24/00429/FUL, planning authority Gateshead)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorExagen (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity13 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.9137, -1.8142DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Gateshead, reference DC/24/00429/FUL)

How it compares

Greenhead Energy Park is the 1,120th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,805th-largest of 2,548 in the United Kingdom by capacity; its 13 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,120th of 1,650171,264 MW<0.1%
United Kingdom1,805th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,504th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 239 grid connections (118 operating, 1,319 MW), 143 substations and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 100.4 MW grid connection at Chopwell HybridGrid connection100 MWPlanned2.2 km
CoalburnsSubstation——2.8 km
Battery storage 99.4 MW grid connection at Maiden Hill Farm BESS DirectGrid connection99.4 MWPlanned3.7 km
Waste 5.225 MW grid connection at Blaydon BurnGrid connection5.23 MWOperating4.9 km
West WylamSubstation——5.9 km
ConsettSubstation——6.6 km
Stellium Newcastle CampusData center——23 km
DXC Wynyard Data CenterData center——45 km

Operator and place

More from Exagen

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page