Power plant · Warwick, England, United Kingdom
Holly Lane Energy Park - Solar Farm & Battery Storage
Holly Lane Energy Park - Solar Farm & Battery Storage is a permitted power plant in Warwick, England, United Kingdom, with 75 MW of capacity, operated by Exagen.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Warwick (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Holly Lane Energy Park, B37 7AN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (appeal granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 30 Jan 2025 (permit W/23/1358, Town and Country Planning Act, issued by Warwick) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Sept 2023 (reference W/23/1358, planning authority Warwick) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Jan 2025 (granted, reference W/23/1358, planning authority Warwick) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Jan 2025 (appeal granted, reference W/23/1358, planning authority Warwick) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 23 Apr 2024 (refused, reference W/23/1358, planning authority Warwick) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Exagen | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 75 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.3667, -1.6164 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Holly Lane Energy Park - Solar Farm & Battery Storage is the 355th-largest of 2,174 power plants planned, permitted or under construction in England and the 611th-largest of 3,222 in the United Kingdom by capacity; its 75 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 355th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 611th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,554th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 383 grid connections (1 operating, 4.51 MW), 8 data centers and 2 substations, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| OHL Tower Connection grid connection | Grid connection | — | — | 0.5 km |
| Burton Green Farm grid connection | Grid connection | — | — | 1.0 km |
| Berkswell Energy Centre grid connection | Grid connection | — | — | 1.8 km |
| Evoque Data Center Solutions | Data center | — | — | 19 km |
| Data center, England (OSM way 710050084) | Data center | — | — | 25 km |
| EE Data Centre | Data center | — | — | 33 km |
| Chipping Norton Primary | Substation | — | — | 48 km |
| Deddington Primary | Substation | — | — | 49 km |
Operator and place
More from Exagen
- Old Wood Energy Park - Battery Energy Storage85 MW · permitted
- Thurcroft Interchange Energy Park - Battery Energy Storage System50 MW · planned
- Greenhead Energy Park49.9 MW · planned
- Old Wood Energy Park - Solar Pv Panel49.9 MW · permitted
- Mantle Solar Farm, Wymeswold - Solar Farm49.9 MW · planned
- Thurcroft Interchange Energy Park - Solar Farm49.9 MW · planned
- Highfield Energy Park40 MW · planned
- Holly Lane Energy Park - Solar Farm & Battery Storage25 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.