Power plant · Central Bedfordshire, England, United Kingdom

Goosey Lodge Industrial Estate Power Station

Goosey Lodge Industrial Estate Power Station is a biomass power plant in Central Bedfordshire, England, United Kingdom, with 16 MW of capacity, operated by Ancillary Components.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGoosey Lodge Industrial Estate , Wymington , Rushden , Northamptonshire, NN10 9LUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2000DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAncillary ComponentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity16 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0212, -0.5962DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned

How it compares

Goosey Lodge Industrial Estate is the 1,080th-largest of 4,036 power plants in England and the 1,792nd-largest of 5,837 in the United Kingdom by capacity; its 16 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,080th of 4,036134,406 MW<0.1%
United Kingdom1,792nd of 5,837200,833 MW<0.1%
All power plants in our data5,530th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 37 grid connections (17 operating, 182 MW), 27 substations and 17 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pulsant Milton Keynes SE-1Data center——12 km
Data center, England (OSM way 460010263)Data center——12 km
Data center, Dunstable (OSM way 526426719)Data center——15 km
East Claydon GSPSubstation——24 km
Pembridge Farm grid connectionGrid connection131 MWPlanned33 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned35 km
Part Haveleys Solar Park grid connectionGrid connection45.5 MWPlanned36 km
Cottisford PrimarySubstation——38 km
Bicester North BSPSubstation——39 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page